Review of submittal packages for corrosion control systems for the Cherry Creek and 15th Street Bridges. Responsible for a review of corrosion control design (by others) for the 36” diameter PCCP water main to ensure RTD’s satisfaction with the design. Participating in the Transportation Expansion Project which consists of approximately 19-miles of Light Rail Transit; Prepared a soil study for the new Elati Maintenance Facility that will accommodate approximately 100-light rail vehicles. Conducted a review of corrosion control specification sections to create a schedule for the systematic review of the corrosion control materials and installation; reviewed of corrosion control inspection reports for the corrosion control facilities installed as part of the TREX Project; In-situ soil resistivity measurements taken at the proposed traction power substation locations for the four-car expansion project.
West Corridor – Performance of in-situ soil resistivity measurements along the proposed alignment. Stray Current Simulation modeling of the proposed alignment and associated traction power design. Quality Control of cathodic protection design calculations and associated detail drawings.
East Corridor – Performance of in-situ soil resistivity measurements at the proposed traction power and switching stations. Corrosion control cost estimate created for the initial design.